EVIONOR
On-Site Analysis - Multiple Chargers
For condominiums, office buildings and underground parking lots, installing multiple electric car charging stations requires careful, forward-looking planning. During the on-site assessment, our experts examine the electrical capacity of the building, the expansion possibilities and the optimal positioning of the charging stations, in order to be able to propose a scalable and safe charging infrastructure in the long term.
We offer dynamic load balancing, individual metering and billing, and a scalable and scalable system design. At the end of the assessment, you will have a clear picture of the number of charging points that can be safely implemented and the estimated investment costs.
Our national network of electricians can carry out the assessment within 5 working days.
The evaluation is non-binding, but if you order the execution of the work from us, its cost will be deducted from the total amount of the installation.

